Thursday, 25 April 2013

25th of April 2013

We Planned out exactly what is need to happen over the next week.
Its our goal to start filming on Monday and Tuesday and leave Wednesday, Thursday, and Friday for video editing it is our aim to be finished by Friday.


I planned out all the equipment and The various different apparatus we are going to have to acquire in order to film the Title Sequence.
We Encountered a few problems.
  • Those being that we need to make or get something to move the Torch light in a fluid arch motion and hold it stationary at each point along the way.
  • We still need to get the dance choreography together.
  • The mannequin that we have is not as flexible as we would like it to be so we have to take off its legs and re-attach them with blu tack or some other means.
  •  Filming it some of the angles may prove tricky



 
Micheal came up with an idea for the Basin we are going to Need and Elaine and i Went down to the materials store to get it made. We will see how that turns out tomorrow.
 
I put my story board to the soundtrack with the rough timing we had planned out for it
 
 
For Monday and Tuesday we have a list of things we need to get.
  •  Black fake fingernails /E
  • White face paint /I
  • Black Board /M
  • White board /M
  • Dancer /E
  • Torch /I/E/M/
  • Dance choreograph /I/E/M/
  • Feathers /M
  • Nail Varnish /E
  • Rubbish Bin Bags /I
  • Red water Ink or food dye /M
  • Paper = Origami swans /I/E
  • Basin I/E/M
  • Mirror I/E
  • Styrofoam cups /I
  • Thread and hairdryer /M
  • Hairspray/E
  • Light rig I/E/M
  • Tripods I/M/E
  • Small mirror /?/I
  • Hammer /I
 
The ones i have to get.
  • White face paint
  • Torch
  • Dance choreography
  • rubbish bin bags
  • paper/origami swan
  • basin
  • mirror
  • Styrofoam cup
  • light rig
  • tripod
  • hammer
  •  
     

No comments:

Post a Comment